PdcCalculation.TotalPostSubcontractingCostsIncl
Jump to navigation
Jump to search
Declaration
TotalPostSubcontractingCostsIncl as double
Description
This method returns the post subcontracting costs of a calculation, including part surcharges including ending surcharge.
Notes
Code example
This code example returns the post subcontracting costs of a calculation, including part surcharges including ending surcharge.
Sub sGetPostSubcontractingCosts
dim objCalc
set objCalc = pdc.ActiveCalculation
msgbox objCalc.TotalPostSubcontractingCostsIncl
set objCalc = nothing
End Sub
Availability
5.2.56.0 and onwards