PdcMaterial.DeliveryDate

From External Bemet Wiki
Revision as of 09:17, 22 May 2012 by Mike (talk | contribs) (Created page with "== Declaration == DeliveryDate as Date == Description == Returns or changes the delivery date == Notes == This property sets or returns the delivery date of a material. ==...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Declaration

DeliveryDate as Date

Description

Returns or changes the delivery date

Notes

This property sets or returns the delivery date of a material.

Code example

This code example opens a calculation, loops through its materials and returns the delivery date for each of them.

dim objCalc

  set objCalc = pdc.OpenCalculation("00685")
  for i = 0 to objCalc.MaterialList.Count -1
    set objMat = objCalc.MaterialList(i)
    msgbox "Material's delivery date: " & objMat.DeliveryDate
  next

Availability

Available since April 2008.