PdcMaterial.BCostPrice

From External Bemet Wiki
Revision as of 09:09, 22 May 2012 by Mike (talk | contribs) (Created page with "== Declaration == BCostPrice as double == Description == Returns the real costprice == Notes == This property returns (i.e. READ ONLY) the actual cost price of the material...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Declaration

BCostPrice as double

Description

Returns the real costprice

Notes

This property returns (i.e. READ ONLY) the actual cost price of the material and is obviously only of interest once production has been reported.

Code example

This code example opens a calculation, loops through its materials, and shows the actual cost price for each material in a message box.

dim objCalc

  set objCalc = pdc.OpenCalculation("00685")
  for i = 0 to objCalc.MaterialList.Count -1
    set objMat = objCalc.MaterialList(i)
    msgbox "The area factor is" & objMat.BCostPrice
  next

Availability