PdcMaterial.AdditionalCosts

From External Bemet Wiki
Revision as of 09:06, 22 May 2012 by Mike (talk | contribs) (Created page with "== Declaration == AdditionalCosts as double == Description == Returns or changes the additional costs == Notes == This property sets or returns the additional costs of the ...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Declaration

AdditionalCosts as double

Description

Returns or changes the additional costs

Notes

This property sets or returns the additional costs of the material. It can not be found in the calculation form, it's a result of certificate costs. In the database this is field DM_MATLINES.DM_EKOST.

Code example

This code example opens a calculation, loops through its materials, and shows the additional costs for each material in a message box.

dim objCalc

  set objCalc = pdc.OpenCalculation("00685")
  for i = 0 to objCalc.MaterialList.Count -1
    set objMat = objCalc.MaterialList(i)
    msgbox "The additional costs are " & objMat.AdditionalCosts
  next

Availability

Available since June 2008 (from version 3.8)