PdcMasterData.Material

From External Bemet Wiki
Revision as of 09:56, 16 January 2017 by Mike (talk | contribs)
Jump to navigation Jump to search

Declaration

Material as PdcMaterial

Description

Methods

Properties

PdcMaterial.NettPurchPriceUnit

Notes

This property represents the material file in Plan-de-CAMpagne.

Code example

This code example opens material "ABC123", changes the nett purchase price unit to 50 and saves.

dim objBaseMat
dim strMatNo

  strMatNo = "ABC123"
  set objBaseMat = pdc.MasterData.Material
  if objBaseMat.Load(strMatNo) then
    ObjBaseMat.NettPurchPriceUnit = 50
    if not objBaseMat.Save(true) then
      msgbox pdc.LastError
    end if
  else
    msgbox pdc.LastError
  end if

Availability

Available since Januari 2017 (From version 5.3)