PdcOperation.WaitBefore

From External Bemet Wiki
Revision as of 13:55, 24 November 2015 by TC (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Declaration

WaitBefore as long

Description

Returns or sets the number of days before the operations processing days starts. WaitBefore increases the processing days.

Notes

This property returns or sets the number of days before the operations processing days starts.
It is shown in the occupationlist in a separate column WB_WAITB.

Code example

Availability

Available since July 2009 (from version 4.2).