PdcCalculation.ChangeDeliveryDate
Declaration
CheckLevels
Description
Changes the production methode of a manufacturing article as is in the materials file
Notes
This method checks all materials in the calculation for made-to-order-production or deliver-from-stock.
Stocked materials are added as material, non-stocked F-parts are added as subcalculation. BEWARE; this method also executes a SaveAsArticle command!
Code example
This code checks the levels of the whole bill of material.
dim objCalc
set objCalc= pdc.OpenCalculation("01281")
if objCalc.changedeliverydate(CDate("2015-10-08"), "KL") then
msgbox "OK"
else
msgbox pdc.LastError
end if
objCalc.Save
objCalc.show
Availability
Available since 3 June 2014 (Version 4.3 onwards).