PdcCalculation.ChangeDeliveryDate

From External Bemet Wiki
Revision as of 10:14, 3 June 2014 by TC (talk | contribs)
Jump to navigation Jump to search

Declaration

CheckLevels

Description

Changes the production methode of a manufacturing article as is in the materials file

Notes

This method checks all materials in the calculation for made-to-order-production or deliver-from-stock.

Stocked materials are added as material, non-stocked F-parts are added as subcalculation. BEWARE; this method also executes a SaveAsArticle command!

Code example

This code checks the levels of the whole bill of material.

dim objCalc

 set objCalc= pdc.OpenCalculation("01281")
 if objCalc.changedeliverydate(CDate("2015-10-08"), "KL") then
   msgbox "OK"
 else
   msgbox pdc.LastError
 end if
 objCalc.Save
 objCalc.show

Availability

Available since 3 June 2014 (Version 4.3 onwards).