PdcProjectLineList.AddCalculationCopy

From External Bemet Wiki
Revision as of 11:26, 31 March 2014 by TC (talk | contribs)
Jump to navigation Jump to search

Declaration

AddCalculationCopy(ACalcNr as String) as PdcProjectLine

Description

Copy the applied calculation always as a new projectline.

Notes

The calculation copy screen is showed. The user can change options for the copy.

Code example

dim objProject
dim objPJLine

  set objProject = pdc.projects.active
  set objPJLine = objProject.ProjectLineList.AddCalculationCopy("01351")
  if IsValid(objPJLine) then
    msgbox "The calculation is copied."
  else
    msgbox "The copy of the calculation is failed."
  end if
  objProject.Refresh

Availability

Available since February 2011 (From version 4.2 onwards).