PdcOperation.WaitBefore: Difference between revisions
Jump to navigation
Jump to search
Created page with "== Declaration == WaitBefore as long == Description == Returns or sets the number of days before the operations processing days starts. WaitBefore increases the processing da..." |
No edit summary |
||
Line 16: | Line 16: | ||
== Availability == | == Availability == | ||
Available since | Available since July 2009 (from version 4.2). |
Latest revision as of 13:55, 24 November 2015
Declaration
WaitBefore as long
Description
Returns or sets the number of days before the operations processing days starts. WaitBefore increases the processing days.
Notes
This property returns or sets the number of days before the operations processing days starts.
It is shown in the occupationlist in a separate column WB_WAITB.
Code example
Availability
Available since July 2009 (from version 4.2).