PdcMaterialFile.WriteOff: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 39: Line 39:


== Availability ==
== Availability ==
Available since Jsnuary 2013 (4.3).
Available since 20 June 2014 (4.3 and 5.1). 5.1 onwards, this function is removed, because other functionality is build with other methods.

Revision as of 07:53, 20 June 2014

Declaration

WriteOff(CalcNo as String, MatPos as String, MatID as long, MatNo as string, StockID as long, Quantity as double) as Boolean

Description

This method writes off a stock line (with certificate) for a specific material number on a calculation.

Notes

CalcNo = Calculation number (DO_ORDNR).
MatPos = Material position in the calculation (DM_POS).
MatID = Material ID in the calculation (DM_ID).
MatNo = Material number (LM_MATN).
StockID = The stockline ID (LMV_ID).
Quantity = The quantity to write off.

This sets of parameters writes off a quantity on a calculation:
1. You have to apply the parameters CalcNo, MatPos, MatNo, StockID and Quantity.
2. You have to apply the parameters MatID, MatNo, StockID and Quantity.

This method writes off the quantity and deduct the existing reservation. The reservation is removed when the remaining quantity is zero.
Write off a material with a different number than the forecast is possible.
A stock history line is also created with this method.

Code example

Adjust a material's sourcing strategy.

Sub btn_SelectMatNrClick(Sender)
  edt_MatNr.Text = pdc.ChooseRecord(36, "", "")
End Sub

Sub btn_CheckSourcesClick(Sender)
dim booResult
dim booStock
  booStock  = (GetAnyField("LM_MAT", "LM_MATN", edt_MatNr.Text, "LM_VR") = "J")
  booResult = pdc.MasterData.MaterialFile.CheckSourceFPart(edt_MatNr.Text, booStock)
  msgbox "CheckSourceFPart = " & booResult
End Sub

Availability

Available since 20 June 2014 (4.3 and 5.1). 5.1 onwards, this function is removed, because other functionality is build with other methods.