PdcCalculation.ChangeDeliveryDate: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
== Declaration ==
== Declaration ==
CheckLevels
ChangeDeliveryDate(NewDate as Date, ChangeCode as String) as Boolean


== Description ==
== Description ==
Changes the production methode of a manufacturing article as is in the materials file
This method changes the delivery date of a calculation.


== Notes ==
== Notes ==

Revision as of 10:15, 3 June 2014

Declaration

ChangeDeliveryDate(NewDate as Date, ChangeCode as String) as Boolean

Description

This method changes the delivery date of a calculation.

Notes

This method checks all materials in the calculation for made-to-order-production or deliver-from-stock.

Stocked materials are added as material, non-stocked F-parts are added as subcalculation. BEWARE; this method also executes a SaveAsArticle command!

Code example

This code checks the levels of the whole bill of material.

dim objCalc

 set objCalc= pdc.OpenCalculation("01281")
 if objCalc.changedeliverydate(CDate("2015-10-08"), "KL") then
   msgbox "OK"
 else
   msgbox pdc.LastError
 end if
 objCalc.Save
 objCalc.show

Availability

Available since 3 June 2014 (Version 4.3 onwards).