PdcCalculation.MaterialCosts: Difference between revisions
Jump to navigation
Jump to search
Created page with "== Declaration == == Description == == Notes == == Code example == <source lang="vb"> </source> == Availability ==" |
No edit summary |
||
Line 1: | Line 1: | ||
== Declaration == | == Declaration == | ||
MaterialCosts as double | |||
== Description == | == Description == | ||
Returns the total value of materialcosts | |||
== Notes == | == Notes == | ||
This property returns the 'MaterialCosts' of the current calculation. It is the sum of all materialcosts (pre calculation) for the selected calculation including all subcalculations. | |||
== Code example == | == Code example == | ||
This code example returns the MaterialCosts of the active calculation. | |||
<source lang="vb"> | <source lang="vb"> | ||
dim objCalc | |||
set objCalc = pdc.ActiveCalculation | |||
msgbox objCalc.MaterialCosts | |||
</source> | </source> | ||
== Availability == | == Availability == |
Latest revision as of 09:32, 21 May 2012
Declaration
MaterialCosts as double
Description
Returns the total value of materialcosts
Notes
This property returns the 'MaterialCosts' of the current calculation. It is the sum of all materialcosts (pre calculation) for the selected calculation including all subcalculations.
Code example
This code example returns the MaterialCosts of the active calculation.
dim objCalc
set objCalc = pdc.ActiveCalculation
msgbox objCalc.MaterialCosts