PdcCalculation.CheckLevels: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
Created page with "== Declaration == == Description == == Notes == == Code example == <source lang="vb"> </source> == Availability =="
 
No edit summary
 
Line 1: Line 1:
== Declaration ==
== Declaration ==
 
CheckLevels


== Description ==
== Description ==
 
Changes the production methode of a manufacturing article as is in the materials file


== Notes ==
== Notes ==
This method checks all materials in the calculation for made-to-order-production or deliver-from-stock.


Stocked materials are added as material, non-stocked F-parts are added as subcalculation. BEWARE; this method also executes a SaveAsArticle command!


== Code example ==
== Code example ==
This code checks the levels of the whole bill of material.


<source lang="vb">
Sub sCheckLevelsOfCalc(robjCalc)
dim intTel


<source lang="vb">
  for intTel = 0 to robjCalc.Children.Count – 1
    sCheckLevelsOfCalc robjCalc.Children(intTel)
  next


  robjCalc.CheckLevels
End Sub
</source>
</source>


== Availability ==
== Availability ==
Available since September 2003.

Latest revision as of 08:24, 21 May 2012

Declaration

CheckLevels

Description

Changes the production methode of a manufacturing article as is in the materials file

Notes

This method checks all materials in the calculation for made-to-order-production or deliver-from-stock.

Stocked materials are added as material, non-stocked F-parts are added as subcalculation. BEWARE; this method also executes a SaveAsArticle command!

Code example

This code checks the levels of the whole bill of material.

Sub sCheckLevelsOfCalc(robjCalc)
dim intTel

  for intTel = 0 to robjCalc.Children.Count  1
    sCheckLevelsOfCalc robjCalc.Children(intTel)
  next

  robjCalc.CheckLevels
End Sub

Availability

Available since September 2003.