PdcCalculation.RecalcDatesPerOperation: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 19: | Line 19: | ||
== Availability == | == Availability == | ||
2024.2.3.0 |
Revision as of 08:47, 15 April 2024
Declaration
RecalcDatesPerOperation()
Description
Recalculates the start date for all operations in the calculation, this includes any subcalculations.
Notes
This method will recalculate the start date for alle operations and then refresh the form. The calculation will still need to be saved afterwards.
Code example
This code example is will take the active calculation, that has a production number reserved, and adds a new operation that will not have a start date. Then by calling the function it will recalculate the start dates.
PDC.App.ActiveCalculation.OperationList.InsertLineNumber(PDCEXT.pdcOperationKind.pdcInternalOp, "FR001", 15)
PDC.App.ActiveCalculation.RecalcDatesPerOperation()
PDC.App.ActiveCalculation.Save()
Availability
2024.2.3.0