PdcCalculation.ChangeDeliveryDate: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
== Declaration == | == Declaration == | ||
ChangeDeliveryDate(NewDate as Date, ChangeCode as String) as Boolean | |||
== Description == | == Description == | ||
This method changes the delivery date of a calculation. | |||
== Notes == | == Notes == |
Revision as of 10:15, 3 June 2014
Declaration
ChangeDeliveryDate(NewDate as Date, ChangeCode as String) as Boolean
Description
This method changes the delivery date of a calculation.
Notes
This method checks all materials in the calculation for made-to-order-production or deliver-from-stock.
Stocked materials are added as material, non-stocked F-parts are added as subcalculation. BEWARE; this method also executes a SaveAsArticle command!
Code example
This code checks the levels of the whole bill of material.
dim objCalc
set objCalc= pdc.OpenCalculation("01281")
if objCalc.changedeliverydate(CDate("2015-10-08"), "KL") then
msgbox "OK"
else
msgbox pdc.LastError
end if
objCalc.Save
objCalc.show
Availability
Available since 3 June 2014 (Version 4.3 onwards).