PdcCalculation.GetSubContractingCosts: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
Created page with "== Declaration == == Description == == Notes == == Code example == <source lang="vb"> </source> == Availability =="
 
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Declaration ==
== Declaration ==
 
GetSubContractingCosts(boExpandAllLevels as Boolean,boInclusiveChildren as Boolean,boDoRecalc as Boolean, boToeslagen as Boolean, boDeelToeslagen as Boolean) as double


== Description ==
== Description ==
 
This method returns the subcontracting costs of a calculation.


== Notes ==
== Notes ==
Line 12: Line 12:


<source lang="vb">
<source lang="vb">
Sub sGetSubcontractingCosts
dim objCalc
  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.GetSubContractingCosts(true, true, true, true, true)


  set objCalc = nothing
End Sub
</source>
</source>


== Availability ==
== Availability ==

Latest revision as of 11:39, 31 July 2013

Declaration

GetSubContractingCosts(boExpandAllLevels as Boolean,boInclusiveChildren as Boolean,boDoRecalc as Boolean, boToeslagen as Boolean, boDeelToeslagen as Boolean) as double

Description

This method returns the subcontracting costs of a calculation.

Notes

Code example

Sub sGetSubcontractingCosts
dim objCalc

  set objCalc = pdc.ActiveCalculation

  msgbox objCalc.GetSubContractingCosts(true, true, true, true, true)

  set objCalc = nothing
End Sub

Availability