PdcOperation.WaitAfter: Difference between revisions
Jump to navigation
Jump to search
Created page with "== Declaration == WaitAfter as long == Description == Returns or sets the number of days after the operations processing days are ended. WaitAfter increases the total number ..." |
No edit summary |
||
Line 16: | Line 16: | ||
== Availability == | == Availability == | ||
Available since | Available since July 2009 (from version 4.2). |
Latest revision as of 13:56, 24 November 2015
Declaration
WaitAfter as long
Description
Returns or sets the number of days after the operations processing days are ended. WaitAfter increases the total number of processing days.
Notes
This property returns or sets the number of days after the operations processing days are ended.
It is shown in the occupationlist in a separate column WB_WAITA.
Code example
Availability
Available since July 2009 (from version 4.2).