PdcOperation.WaitBefore: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
Created page with "== Declaration == WaitBefore as long == Description == Returns or sets the number of days before the operations processing days starts. WaitBefore increases the processing da..."
 
No edit summary
 
Line 16: Line 16:


== Availability ==
== Availability ==
Available since November 2015 (from version 5.0).
Available since July 2009 (from version 4.2).

Latest revision as of 13:55, 24 November 2015

Declaration

WaitBefore as long

Description

Returns or sets the number of days before the operations processing days starts. WaitBefore increases the processing days.

Notes

This property returns or sets the number of days before the operations processing days starts.
It is shown in the occupationlist in a separate column WB_WAITB.

Code example

Availability

Available since July 2009 (from version 4.2).