PdcCalculation.ChangeDeliveryDate: Difference between revisions
No edit summary |
No edit summary |
||
Line 15: | Line 15: | ||
== Code example == | == Code example == | ||
This code | This code changes the delivery date of calculation "01281" to 8-10-2015. | ||
<source lang="vb"> | <source lang="vb"> |
Latest revision as of 10:26, 3 June 2014
Declaration
ChangeDeliveryDate(NewDate as Date, ChangeCode as String) as Boolean
Description
This method changes the delivery date of a calculation.
Notes
Two possible situations:
1. The calculation is in production: The delivery date of the calculation is changed to the new date and also the reservations, purchase lines and more are moved to the new date (The same functionality like PdC). All children are also changed, but with a calculated delivery date based on NewDate, materials and operations (Inclusive reservations, purchase lines and more). Is a child calculation not in production, it is skipped.
2. The calculation is not in production: The delivery date of the calculation is changed to the new date. All children are also changed, but with a calculated delivery date based on NewDate, materials and operations. Is a child calculation in production, it is skipped.
Parameters:
NewDate: The NewDate value is the new delivery date.
ChangeCode: The identifying value for the change of the delivery date.
Code example
This code changes the delivery date of calculation "01281" to 8-10-2015.
dim objCalc
set objCalc= pdc.OpenCalculation("01281")
if objCalc.changedeliverydate(CDate("2015-10-08"), "KL") then
msgbox "OK"
else
msgbox pdc.LastError
end if
objCalc.Save
objCalc.show
Availability
Available since 3 June 2014 (Version 4.3 onwards).