PdcCalculation.SurchargeAdditional: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
Created page with "== Declaration == == Description == == Notes == == Code example == <source lang="vb"> </source> == Availability =="
 
No edit summary
 
Line 1: Line 1:
== Declaration ==
== Declaration ==
 
SurchargeAdditional as double


== Description ==
== Description ==
 
Returns or changes the surcharge of additional costs


== Notes ==
== Notes ==
 
This property sets or returns the surcharge used for additional costs in the current calculation.


== Code example ==
== Code example ==
 
This code example returns the surcharge for additional costs in the active calculation.


<source lang="vb">
<source lang="vb">
dim objCalc


  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.SurchargeAdditional
</source>
</source>


== Availability ==
== Availability ==

Latest revision as of 10:20, 21 May 2012

Declaration

SurchargeAdditional as double

Description

Returns or changes the surcharge of additional costs

Notes

This property sets or returns the surcharge used for additional costs in the current calculation.

Code example

This code example returns the surcharge for additional costs in the active calculation.

dim objCalc

  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.SurchargeAdditional

Availability