PdcCalculation.IsInProduction: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
Created page with "== Declaration == == Description == == Notes == == Code example == <source lang="vb"> </source> == Availability =="
 
No edit summary
 
Line 1: Line 1:
== Declaration ==
== Declaration ==
 
IsInProduction as Boolean


== Description ==
== Description ==
 
Returns if the calculation is in production


== Notes ==
== Notes ==
 
This property returns the value of the 'IsInProduction' property of the current calculation. It will return 'true' when the calculation is in production.


== Code example ==
== Code example ==
 
This code example returns the IsInProduction state of the active calculation.


<source lang="vb">
<source lang="vb">
dim objCalc


  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.IsInProduction
</source>
</source>


== Availability ==
== Availability ==

Latest revision as of 09:23, 21 May 2012

Declaration

IsInProduction as Boolean

Description

Returns if the calculation is in production

Notes

This property returns the value of the 'IsInProduction' property of the current calculation. It will return 'true' when the calculation is in production.

Code example

This code example returns the IsInProduction state of the active calculation.

dim objCalc

  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.IsInProduction

Availability