PdcCalculation.CostEstimation: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
Created page with "== Declaration == == Description == == Notes == == Code example == <source lang="vb"> </source> == Availability =="
 
No edit summary
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
== Declaration ==
== Declaration ==
 
CostEstimation as double


== Description ==
== Description ==
 
Returns the total value of cost estimation


== Notes ==
== Notes ==
 
This property returns the 'CostEstimation' (pre calculation) of the current calculation. When retrieving this value of a newly created calculation, save it first to get the correct result.


== Code example ==
== Code example ==
 
This code example returns the costestimation of the active calculation.


<source lang="vb">
<source lang="vb">
dim objCalc


  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.CostEstimation
</source>
</source>


== Availability ==
== Availability ==

Latest revision as of 08:26, 12 July 2016

Declaration

CostEstimation as double

Description

Returns the total value of cost estimation

Notes

This property returns the 'CostEstimation' (pre calculation) of the current calculation. When retrieving this value of a newly created calculation, save it first to get the correct result.

Code example

This code example returns the costestimation of the active calculation.

dim objCalc

  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.CostEstimation

Availability