PdcOperation.WaitAfter: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
Created page with "== Declaration == WaitAfter as long == Description == Returns or sets the number of days after the operations processing days are ended. WaitAfter increases the total number ..."
 
No edit summary
 
Line 16: Line 16:


== Availability ==
== Availability ==
Available since November 2015 (from version 5.0).
Available since July 2009 (from version 4.2).

Latest revision as of 13:56, 24 November 2015

Declaration

WaitAfter as long

Description

Returns or sets the number of days after the operations processing days are ended. WaitAfter increases the total number of processing days.

Notes

This property returns or sets the number of days after the operations processing days are ended.
It is shown in the occupationlist in a separate column WB_WAITA.

Code example

Availability

Available since July 2009 (from version 4.2).