PdcCalculation.SurchargeSubContract: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
Created page with "== Declaration == == Description == == Notes == == Code example == <source lang="vb"> </source> == Availability =="
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
== Declaration ==
== Declaration ==
 
SurchargeSubContract as double


== Description ==
== Description ==
 
Returns or changes the surcharge of subcontractor costs


== Notes ==
== Notes ==
 
This property sets or returns the surcharge used for subcontracted operations in the current calculation.


== Code example ==
== Code example ==
 
This code example returns the surcharge for subcontracted operations in the active calculation.


<source lang="vb">
<source lang="vb">
dim objCalc


  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.SurchargeSubContract
</source>
</source>


== Availability ==
== Availability ==

Latest revision as of 10:22, 21 May 2012

Declaration

SurchargeSubContract as double

Description

Returns or changes the surcharge of subcontractor costs

Notes

This property sets or returns the surcharge used for subcontracted operations in the current calculation.

Code example

This code example returns the surcharge for subcontracted operations in the active calculation.

dim objCalc

  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.SurchargeSubContract

Availability