PdcCalculation.Norm: Difference between revisions
Jump to navigation
Jump to search
Created page with "== Declaration == == Description == == Notes == == Code example == <source lang="vb"> </source> == Availability ==" |
No edit summary |
||
Line 1: | Line 1: | ||
== Declaration == | == Declaration == | ||
Norm as String | |||
== Description == | == Description == | ||
Returns or changes the productionnorm | |||
== Notes == | == Notes == | ||
This property returns or sets the (production)'Norm' of the current calculation. | |||
== Code example == | == Code example == | ||
This code example returns the Norm of the active calculation. | |||
<source lang="vb"> | <source lang="vb"> | ||
dim objCalc | |||
set objCalc = pdc.ActiveCalculation | |||
msgbox objCalc.Norm | |||
</source> | </source> | ||
== Availability == | == Availability == |
Latest revision as of 10:01, 21 May 2012
Declaration
Norm as String
Description
Returns or changes the productionnorm
Notes
This property returns or sets the (production)'Norm' of the current calculation.
Code example
This code example returns the Norm of the active calculation.
dim objCalc
set objCalc = pdc.ActiveCalculation
msgbox objCalc.Norm