PdcCalculation.FinishedQuantity: Difference between revisions

From External Bemet Wiki
Jump to navigation Jump to search
Created page with "== Declaration == == Description == == Notes == == Code example == <source lang="vb"> </source> == Availability =="
 
No edit summary
 
Line 1: Line 1:
== Declaration ==
== Declaration ==
 
FinishedQuantity as double


== Description ==
== Description ==
 
Returns the finished quantity


== Notes ==
== Notes ==
 
This property returns the 'FinishedQuantity' of the current calculation. This field can be found in the 'Other' treenode.


== Code example ==
== Code example ==
 
This code example returns the FinishedQuantity of the active calculation.


<source lang="vb">
<source lang="vb">
dim objCalc


  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.FinishedQuantity
</source>
</source>


== Availability ==
== Availability ==

Latest revision as of 09:15, 21 May 2012

Declaration

FinishedQuantity as double

Description

Returns the finished quantity

Notes

This property returns the 'FinishedQuantity' of the current calculation. This field can be found in the 'Other' treenode.

Code example

This code example returns the FinishedQuantity of the active calculation.

dim objCalc

  set objCalc = pdc.ActiveCalculation
  msgbox objCalc.FinishedQuantity

Availability